Project Title: INSTALLATION OF LSFO, FUEL GAS AND GAS OIL PIPELINES PROJECT FOR PIPELINE CONSTRUCTION WORKS FOR PORTION 2A
Owner: Kuwait Oil Company (KOC)

Client: Hyundai Engineering & Construction Co., Ltd.

Project Dates: 2011 - 2013

Contract Value: 10,844,315 KD
Project Description

      Installation Of Low Sulphur Fuel , Fuel Gas & Gasoil Pipelines From Mina Al Ahmadi to Sabiya & Doha Power Stations

      Scope was Mechanical-Construction of New Pipe lines from Mina Ahmadi Refinery towards Kadma

      1. 48” Diameter Pipeline for Fuel Gas , welding for 52 KM length

      2. 24” Diameter Pipeline for Gas Oil , welding for 52 KM

      3. 24” Diameter Pipeline (Insulated Pipes) , for Low Sulphur Fuel Oil , welding for 52 KM

      4. 40” Diameter Pipeline for Rich Gas , welding for 2.5 KM

      5. 12” Diameter Pipeline for Condensate Gas welding for 2.5 KM

      The Construction scope included:

      1. Welding for the Main pipeline on above ground for continuous length for a Max of 1 KM per section

      2. Lowering of the welded sections into the trench

      3. Tie-In welding for the lowered section

      4. Insertion of welded pipeline sections for the Trench less Road crossings

      5. Coating works for the welded joints

      6. Testing – Cleaning Pigging, Gauging Pigging, Water filling, pressurizing , de-watering, swabbing, drying, purging.

      The Civil Scope Included:

      1. Construction of Right or Way (ROW)

      2. Land Survey

      3. Trenching (Excavation)

      4. Backfilling

      5. Berm Construction

      6. Valve pit concreate works.